123 Victoria Street

Cost: €50 million
Client: Wates Construction
Stage: Construction

Victoria Street - EDC

CASE STUDIES



DETAILS

123 Victoria Street, originally built in 1975 consists of 3 basement levels, a ground floor and 12 upper levels. The fit out and refurbishment of the upper 12 floors and basement will be carried out whilst the retail units on the ground floor were still trading. The refurbishment includes plant areas, replacement roof and roof plant, BMS and general office space.

Edc, in a very tight timeframe, carried out a design risk assessment as well as proposing several alternative design solutions to reduce program, capital and running costs and critically co2 emmissions.